Arrow Energy is progressing its natural gas development northeast of Miles to produce essential energy.
To support this project, we lodged an application under the Environment Protection and Biodiversity Conservation Act 1999 with the National Environmental Protection Agency (the Agency) for the development of a solar farm on an Arrow-owned property. The proposed solar farm is intended to supply renewable energy to Arrow Energy’s natural gas facilities and represents a key initiative in the company’s strategy to reduce greenhouse gas emissions from its operations.
Following submission, Arrow Energy have been instructed by the Agency to undertake a public comment period.
How can you have your say?
The community can have their say by making a submission about the application documents.
Under the statutory process, public comment is open for 10 business days, up until COB 5 November 2026.
Please forward your submission material through to:
Email: [email protected]
Post: GPO Box 5262, Brisbane QLD 4001, Australia
Enquiries can also be made by calling 1800 038 856 (toll free).
The draft Preliminary Documentation is available for public review from 23 October 2026 to
5 November 2026 at:
- Miles Library: Corner Dawson and Murilla Streets, Miles QLD 4415
- State Library of Queensland: John Oxley Library, Level 4, Stanley Place, South Brisbane QLD 4101
- National Environmental Protection Agency (NEPA): Members of the public may arrange a viewing of the documentation at John Gorton Building, King Edward Terraces, Parkes ACT 2601. Please arrange a viewing by contacting [email protected] and quote EPBC 2024-10002.
You can also view the materials, below:
- Arrow Energy EPBC 2024-10002 Public Notice
- SGP North Solar Farm EPBC 2024-10002 Request For Additional Information
- Preliminary Documentation Surat Gas Project (SGP) North Solar Farm (EPBC 2024/10002)
- Appendix A – Referral Decision
- Appendix B – Reference Table
- Appendix C – Offset Proposal
- Appendix D – Offset Management Plan
- Appendix E – Desktop Search Results
- Appendix F – Likelihood of Occurrence Assessment
- Appendix G – Survey Datasheets
- Appendix H – Species List
- Appendix I – Arrow Energy HSE Policy
- Appendix J – Arrow Energy Land Disturbance Guideline
- Appendix K – Arrow Energy Biosecurity Procedure
- Appendix L – Arrow Energy Vehicle and Machinery Hygiene Procedure
- Appendix M – Bushfire Hazard Assessment and Management Plan
- Appendix N – Cultural Heritage Field Assessment
- MHQA OAG Spreadsheets
- SGP North Solar Farm Offset Site Proposal Shapefiles
- SGP North Solar Farm Development Footprint Shapefiles (30.1 ha)
SGP North SF EPBC 2024-10002 Referral (21 JAN 2025):
- 00-2024-10002 Referral
- Att A-SGP North Solar Farm Significant Impact Assessment (Rev 5, 8 Jan 2025)
- Att B-SGP North Solar Farm Location map
- Att C-SGP North Expansion Media Release (12 Aug 2024)
- Att D-SGP North Public Notice (2 Aug 2024)
- Att E-Letter to Landholders on Arrow Energy’s proposed future development
- Att G-Cultural Heritage Field Assessment 2021-REDACTED
- Att H-Health Safety and Environment (HSE) Policy (Arrow Energy, Rev 6.0, 6 June 2024)
- Att I-HSE Standards Compendium (Arrow Energy, Version 5.0, March 2021)
- Att J-SGP North Solar Farm Original Footprint Metadata
- Att K-SGP North Solar Farm Avoidance Areas map
- Att L-SGP North Solar Farm Final Footprint Metadata
- Att M-SGP North Solar Farm Avoidance Areas Metadata
- Att N-WDRC Property Report for Lot Plan 17AU199 (22 Aug 2024)
- Att O-Condamine-Balonne River catchment area
- Att P-Solar Site Layout-REDACTED