Surat Gas Project (SGP) North Environmental Authority (EA0001399) amendment application.
As required under the Environmental Protection Act 1994 (Qld), Arrow Energy have prepared and submitted an EA amendment application as listed below:
- EA (EA0001399) Amendment Application Form – 05 Dec 2023 PDF 15.58 MB
- Notice of Change to EA0001399 Amendment (ref A-EA-AMD-100565408) PDF 451.48 KB
- EA (EA0001399) Amendment Supporting Information Report (V2.0) – 05 04 2024 PDF 4.54 MB including:
- Appendix A. Summary of Proposed SGP North EA (EA0001399) Amendments; and
- Appendix D. Proposed Prescribed Environmental Matters (PEMs) EA table.
- Appendix B. Draft EA (EA0001399 with marked-up changes) PDF 1.13 MB
- Appendix C. Biodiversity Impact Assessment (Attexo Consulting) PDF 42.52 MB
- Appendix E. SGP North Total Current Disturbance Area Spatial Data (zip file)
- Appendix E. SGP North Stage 1 MSES Spatial Data (zip file)
- Appendix E. SGP North Stage 1 ESA Spatial Data (zip file)
- Appendix F. Air Quality Impact Assessment (SLR Consulting) PDF 2.81 MB
- Appendix G. Noise Impact Assessment (SLR Consulting) PDF 2.24 MB
- Appendix H. Coal Seam Gas (CSG) Water Management Plan PDF 2.86 MB
- Appendix I. SGP Terrestrial Ecology Report (EcoSmart Ecology, 2017) PDF 16.34 MB